Full MEP Engineering Project Management
A successful project design brings together multiple professionals (Architect, Quantity Surveyor, Structural Engineering Firm, Thermal and MEP Engineering Firm, etc.). BadieM partners with building-sector stakeholders to deliver comprehensive MEP and renewable energy solutions. From the initial concept stage through contractor consultation, construction supervision, and final handover, our team supports clients to ensure project outcomes meet expectations.


Our Philosophy
Designing coherent and high-performance projects while ensuring continuous monitoring of installations after commissioning. All our project handovers are systematically performed under real operating conditions ("dynamic" reception), including measurement, data analysis, and validation.
Project Design
During an engineering project management assignment, several stages are carried out to design and describe the project. The objective is to confirm the project's feasibility with the client, both functionally and financially.
Different phases ensure coordinated teamwork within the project management team:
-
Concept Design
-
Preliminary Design (Outline Proposal)
-
Detailed Design
-
Final Project Design
-
Tender Documentation
-
Assistance to the client during the awarding of construction contracts


Construction Supervision
Following contractor selection, effective site supervision is key to the future performance of the building.
The main phases involved are:
-
Approval of Contractors’ Execution Plans
-
Management of Construction Works
During these phases, proactive communication and guidance with contractors are essential for creating a collaborative team environment. BatiMgie utilizes instrumentation and monitoring tools to verify proper installation of equipment and ensure accurate future adjustments.
Commissioning and Handover of Installations
This phase involves assisting the client during project handover operations.
All our installations are systematically commissioned under real operational conditions ("dynamic" commissioning), including measurements and data analysis for validation. The goal is to confirm contractor settings immediately upon client takeover of the building.

Commissioning and Handover of Installations
This phase involves assisting the client during project handover operations.
All our installations are systematically commissioned under real operational conditions ("dynamic" commissioning), including measurements and data analysis for validation. The goal is to confirm contractor settings immediately upon client takeover of the building.
Also,
To enhance the quality of our energy analyses, BatiMgie also holds the following additional OPQIBI qualifications:
-
Energy performance studies for HVAC systems – Certifications No. 1326 and 1327
-
General HVAC engineering – Certification No. 1322
-
Design of standard heating and ventilation systems (HVAC) – Certification No. 1312
-
Building envelope energy performance engineering – Certification No. 1224